Skip to main content
Help
Editing Step 4 —

Step Type:

Drag to rearrange

Drill M5 (or what fits) holes on the middle of the vertical sides of the L channel aluminum beams.

Pass the cable ties through the holes and secure them using single cable connector strips.

Once all 3 ties are in place, slide the Φ22 aluminum pipe through the top and the bottom 3D printed brackets.

Secure and tie all bolts. Adjust the height of the aluminum central pipe if needed.

Your tripod is now complete!

You can dissemble and easily carry the tripod by unsecuring 2 of the 3 cable ties, detaching one side for each of the three L channel aluminum beams and loosing the top bracket bolts.

Your contributions are licensed under the open source Creative Commons license.