Skip to main content

You're viewing a previously published revision of this guide.  View latest revision

Older Newer
  1. Electronics Assembly  You will need:
    • Electronics Assembly You will need:

    • The SatNOGS v2 Mechanical Ground Station Assembly.

    • TP-Link WR703N

    • SatNOGS PCB

    • SatNOGS PSU PCB

    • A 4 port USB hub

    • 2 USB micro cables

    • One double wire for 12V to SatNOGS PCB

  2. Using double sided foam tape, place the TP Link on the side as shown.
    • Using double sided foam tape, place the TP Link on the side as shown.

Pierros Papadeas

Member since: 4/23/14

965 Reputation

7 Guides authored

View Statistics:

Past 24 Hours: 2

Past 7 Days: 4

Past 30 Days: 21

All Time: 11,000